Launch the digital presence
Facebook and Instagram setup, brand direction, content cadence and an Islamabad-focused audience strategy.
MettGlobal connected brand launch, social content, Meta acquisition, lead handling, digital journey, outdoor visibility and on-ground activation into one operating system for Jetour Ittehad.
Jetour Ittehad needed more than isolated posts or ads. The operating problem was to create a recognizable Islamabad presence and make each enquiry trackable through follow-up.
Facebook and Instagram setup, brand direction, content cadence and an Islamabad-focused audience strategy.
Meta lead-generation activity around the Jetour T1 i-DM using Reel and image creative.
A structured flow from enquiry to Google Sheet/CRM entry, notification, follow-up and sales outcome.
Billboard visibility and documented public activations reinforced the same brand story beyond social platforms.
The strongest story is not a vague claim about reach. It is the distribution of the 79 verified leads and what happened next.
Visit-stage+ is calculated as booked + visited + scheduled: 16 of 79 leads = 20.3%. The source workbook displayed 15 / 19.0%; this page uses the reconciled status counts instead of repeating that inconsistency.
Lead generation becomes commercially useful only when the handoff and follow-up are designed with the campaign.
The supplied case-study material documents approximately five to six billboard placements across Islamabad.
Jashn Event, Lake View Park, PakWheels Car Mela, Jazz × Ittehad, Asian Wok × Jetour, Giga Mall and Chaaye Khana.
More than half of the documented lead set remained new or in pipeline at the snapshot date, so the case study does not treat the early booking count as the final campaign outcome.
The source workbook included language such as “most-booking”, “cost-effective” and “strong ROI signal” without the comparative market data, spend, revenue or CPL required to support those claims publicly. We kept the evidence and removed the theatre.
We can map the acquisition, follow-up and operating flow before more budget is added.
Discuss a project